PROJECT DETAILS
Transport company J. Heebink Logistic Services has built a new office and warehouse along the highway A12 in Veenendaal. A new office, warehouse and parking area has been realized on a contiguous plot of 50.000 m2.
A cross-dock warehouse of 5,000 m2 has been realized on the ground floor. There is also a second floor in the building, where goods can be stored for a long time. This warehouse is almost 4,000 m2 and is used for, among other things, order picking and storage. In total, the complex is 16.5 meters high.
Naturally, everything is equipped with energy-efficient LED lighting. The screen-friendly PLATO SQUARE series has been used in the offices. LAMA+ and NORMA+ luminaires have been installed in the transfer hall, which provide very uniform lighting on the work floor. And the MULTI+ 30 with sensor has been used in the corridors.
CUSTOMER: J. Heebink Logistic Services
ARCHITECT/DESIGNER: DBL Architecten
LIGHTING DESIGNER: Neofos
ELECTRICIAN: Elektrobouw Lunteren
PHOTOGRAPHER: Jaap Lotstra
A cross-dock warehouse of 5,000 m2 has been realized on the ground floor. There is also a second floor in the building, where goods can be stored for a long time. This warehouse is almost 4,000 m2 and is used for, among other things, order picking and storage. In total, the complex is 16.5 meters high.
Naturally, everything is equipped with energy-efficient LED lighting. The screen-friendly PLATO SQUARE series has been used in the offices. LAMA+ and NORMA+ luminaires have been installed in the transfer hall, which provide very uniform lighting on the work floor. And the MULTI+ 30 with sensor has been used in the corridors.
CUSTOMER: J. Heebink Logistic Services
ARCHITECT/DESIGNER: DBL Architecten
LIGHTING DESIGNER: Neofos
ELECTRICIAN: Elektrobouw Lunteren
PHOTOGRAPHER: Jaap Lotstra
SHARE
VISIT PROJECT